Borden Avenue Pump Station
This project includes removal of the current pump station, expansion of the station footprint, and upgrades to the existing force main.
Coney Island Level 1 BNR Upgrade
Construction of a Level 1 – Biological Nutrient Removal (BNR) upgrade including improvements to the Aeration System, addition of baffle walls and mixers,
Repair & Improvements to City of Glen Cove Pump Stations
Work includes demolition, repair, rehabilitation, and/or new construction at (3) pump station locations…
Glen Cove Wastewater Treatment Plant
The work to being completed includes two (2) new belt filter presses inside of the existing Dissolved Air Flotation (DAF) Building, a new electric
Skanska/RJ Coney Island CI-119
Replacement of the Main Sewage Pumps and related equipment. Furnish and install new discharge piping, replace six (6) Main Sewage Pumps, demolition of…
Skanska/RJ Hunts Point
Installation of four (4) 3.2 million gallon capacity concrete digesters at the Hunts Point Wastewater Treatment Plant in Bronx, NY.
Skanska/RJ NYC DEP
Installation of four (4) 3.2-million-gallon capacity concrete digesters at the Hunts Point Wastewater Treatment Plant in Bronx, NY.
Victory Boulevard Pump Station Upgrade
Construct new pump station to replace (and partially demo) the existing. Scope includes site work, excavation, concrete, structural, connect piping and…

Long Beach WPCP Consolidation - Pump Station Consolidation
Convert the existing influent pump station to a transfer pumping station and construct an interim electrical facility, temporary by-pass station, grinder chambers;

Borden Avenue Pump Station Upgrade
Scope includes the expansion of the building footprint, relining of force main, site work, concrete floors, new wet well submersible main sewage pumps.

Port Richmond Wastewater Resource Recovery Facility
Remove and replace a six (6) main sewage pumps (including motors, controls and components); remove two (2) 72-inch sluice gates at the influent end…
Jerome Park Reservoir (Bronx, NY) - Sluice Gate Replacement
Replacement of three (3) sluice gates and screens; install new electric actuators, demolition and removal of existing gates, remove and dispose hazardous materials, clean stop log groves (not used for channel isolation), start-up and testing.
Port Richmond Water Resource Recovery Facility (Staten Island, NY) - Emergency Reconstruction of Aeration Tank Air Distribution System
Demolition of existing piping and aeration equipment in the (4) Aeration Tanks (and channels); furnish and install new air header piping, pipe supports, structural joints, coarse-bubble diffusers.
Glendale Pumping Station Reconstruction
Full rehabilitation of stormwater pumping station with increased capacity from 1.16 MGD to 2.4 MGD. Work includes concrete repairs, waterproofing, new equipment pads, mechanical, electrical and instrumentation work, fencing, bollards, paving, site restoration and architectural improvements (painting).
Bergen Point Wastewater Treatment Plant - Final Effluent Suction Pipe Replacement
Scope includes demolition, site clearing, relocate underground utilities, install piping and (gate) valves, concrete, demolition, new retaining wall, construction and operation of 80 MGD bypass system, full MOPO, electrical and control work, wet wells, lead paint abatement and field testing.
Bergen Point Wastewater Treatment Plant - Emergency Repair at Scavenger Waste Facility
Scope includes remove and reconstruct existing concrete top slabs over scavenger waste holding tanks1 & 2; replace block walls, doors, stairway, fan, louver; replace scavenger mixers, transfer pumps, piping, valves; electrical and instrumentation at sub-basement levels, install gas-detection instrumentation, air handling units and fans. Implementation of MOPO to maintain plant operations, and lead paint abatement.