Remove and replace a six (6) main sewage pumps (including motors, controls and components); remove two (2) 72-inch sluice gates at the influent end of the main pump header and replace with 84-inch slide gates; and replace two (2) seal water systems and install new drywell flood recovery pumping system. Install instrumentation package for the main sewage pumps (and seal water system), replace blowers, cooling water system and piping; and install HVAC equipment. Contract Amount $52,787,700, Target Completion Date: 2027.
Contract Price:
$52,787,700
$52,787,700
Owner:
Port Richmond Wastewater Resource Recovery Facility
Port Richmond Wastewater Resource Recovery Facility
Completion Year:
2027
2027
Project Status:
Current Project
Current Project